From
Alex Construction and Renovation INC. Alex Construction and Renovation INC.
45 Dan Road, suite 125
Canton, MA 02021
US
To
Catherine Chiang
10 Fisher Rd
Sharon, MA 02067
US
Date
November 3, 2023
Estimate Number
1462
Expiration Date
December 3, 2023
Estimate Total
$33,100.00
  1. Service
    Price
    Amount

    HALF BATHROOM RENOVATION

    ● Remove Floor, Toilet, Vanity.
    ● Preparation Schluter System on the Floor.
    ● Installation new Vanity, Faucets, Mirror, Bathroom Accessories.
    ● Install new Baseboard for all Bathroom.
    ● Paint all bathroom.

    $4,200
    $4,200
  2. Task
    Rate
    Qty
    Amount

    PLUMBING.
    ● Install New valve for toilet and sink.
    ● Install New Flange for toilet.
    ● Install New toilet and sink

    Note: This bathroom includes making a new wall to continue the same level (1 ft.)

    $1,000
    1
    $1,000
  3. Service
    Price
    Amount

    Bathroom Renovation Second Floor
    ● Demolition all bath (not including ceiling and wall).
    ● Repair wall.
    ● Repair framing for new shower.
    ● Install new drywall and plaster, only in the removed parts.
    ● Preparation, Schluter system Waterproofing for new shower, wall and floor (shower cabin only) include only a niche in the wall.
    ● Installation Tile or Porcelain (Wall and floor only shower).
    ● Install floor Tile or Porcelain (floor outside the shower).
    ● Installation (New Vanity, Faucets, Mirror, Bath Accessory).
    ● Carpenters Finish (Install new Baseboard).
    ● Paint the bathroom.
    ● Installing glass doors (Includes only installation of regular
    doors; If you have special measurements and models is
    requiring a separate estimate).

    $11,000
    $11,000
  4. Task
    Rate
    Qty
    Amount

    PLUMBING
    ● New valve for shower, sink toile.
    ● Install new toilet and sink.
    ELECTRIC (Change vanity fan and light with new ones).

    $2,000
    1
    $2,000
  5. Service
    Price
    Amount

    MASTER BATHROOM RENOVATION

    ● Demolition all bath (not including ceiling and wall).
    ● Remove tub.
    ● Repair wall.
    ● Repair framing for shower and new framing behind the tub (Schluter Niche).
    ● Install new drywall and plaster, only in the removed parts.
    ● Preparation, Schluter system Waterproofing for new shower.
    ● Installation Tile or Porcelain (Wall and floor only shower).
    ● Install floor Tile or Porcelain (floor outside the shower).
    ● Installation (New Vanity, Faucets, Mirror, Bathroom Accessories).
    ● Carpenters Finish (Install New Baseboard).
    ● Paint the bathroom.
    ● Installing glass doors (Includes only installation of regular doors; If you have special measurements and models is requiring a separate estimate).

    $10,000
    $10,000
  6. Task
    Rate
    Qty
    Amount

    PLUMBING
    ● New valve for shower, sink toilet.
    ● Install new toilet and sink.
    ● Install new Tub.
    ELECTRIC (Change vanity fan and light with new ones).

    $2,000
    1
    $2,000
  7. Service
    Price
    Amount

    MOVING TRASH

    $600
    $600
  8. Task
    Rate
    Qty
    Amount

    CITY’S PERMITS AND FEES

    $2,300
    1
    $2,300
Subtotal $33,100.00
Total $33,100.00

Notes

Thank you; we really appreciate your business.

Terms

> The materials will be the responsibility of the client; it’s not included. Like these material: tile, grout, vanity light, sink toilet, mirror, doors and glass door.

> This budget. Includes Material for the shower cabin and floor outside the shower, Schluter System. Ditra, 1 Niche, 2by4, Drywall-plaster, any other material not specified here. It will be paid by the client.

>Any service requested that is not specified has an extra payment.

Status Update
November 3, 2023 @ 1:12 pm

Status changed: Draft to Pending.

Status Update
November 3, 2023 @ 1:12 pm

Status changed: Draft to Pending.

Viewed
November 3, 2023 @ 1:12 pm

Estimate viewed by 201.162.234.165 for the first time.

Viewed
November 3, 2023 @ 1:14 pm

Estimate viewed by (admin) for the first time.

Updated
November 3, 2023 @ 1:15 pm

Estimate updated by admin.

Updated
November 3, 2023 @ 1:17 pm

Estimate updated by admin.

Updated
November 3, 2023 @ 1:19 pm

Estimate updated by admin.

Updated
November 3, 2023 @ 1:21 pm

Estimate updated by admin.

Viewed
November 6, 2023 @ 3:41 pm

Estimate viewed by for the first time.