#1462
HALF BATHROOM RENOVATION
● Remove Floor, Toilet, Vanity.
● Preparation Schluter System on the Floor.
● Installation new Vanity, Faucets, Mirror, Bathroom Accessories.
● Install new Baseboard for all Bathroom.
● Paint all bathroom.
PLUMBING.
● Install New valve for toilet and sink.
● Install New Flange for toilet.
● Install New toilet and sink
Note: This bathroom includes making a new wall to continue the same level (1 ft.)
Bathroom Renovation Second Floor
● Demolition all bath (not including ceiling and wall).
● Repair wall.
● Repair framing for new shower.
● Install new drywall and plaster, only in the removed parts.
● Preparation, Schluter system Waterproofing for new shower, wall and floor (shower cabin only) include only a niche in the wall.
● Installation Tile or Porcelain (Wall and floor only shower).
● Install floor Tile or Porcelain (floor outside the shower).
● Installation (New Vanity, Faucets, Mirror, Bath Accessory).
● Carpenters Finish (Install new Baseboard).
● Paint the bathroom.
● Installing glass doors (Includes only installation of regular
doors; If you have special measurements and models is
requiring a separate estimate).
PLUMBING
● New valve for shower, sink toile.
● Install new toilet and sink.
ELECTRIC (Change vanity fan and light with new ones).
MASTER BATHROOM RENOVATION
● Demolition all bath (not including ceiling and wall).
● Remove tub.
● Repair wall.
● Repair framing for shower and new framing behind the tub (Schluter Niche).
● Install new drywall and plaster, only in the removed parts.
● Preparation, Schluter system Waterproofing for new shower.
● Installation Tile or Porcelain (Wall and floor only shower).
● Install floor Tile or Porcelain (floor outside the shower).
● Installation (New Vanity, Faucets, Mirror, Bathroom Accessories).
● Carpenters Finish (Install New Baseboard).
● Paint the bathroom.
● Installing glass doors (Includes only installation of regular doors; If you have special measurements and models is requiring a separate estimate).
PLUMBING
● New valve for shower, sink toilet.
● Install new toilet and sink.
● Install new Tub.
ELECTRIC (Change vanity fan and light with new ones).
MOVING TRASH
CITY’S PERMITS AND FEES
Thank you; we really appreciate your business.
> The materials will be the responsibility of the client; it’s not included. Like these material: tile, grout, vanity light, sink toilet, mirror, doors and glass door.
> This budget. Includes Material for the shower cabin and floor outside the shower, Schluter System. Ditra, 1 Niche, 2by4, Drywall-plaster, any other material not specified here. It will be paid by the client.
>Any service requested that is not specified has an extra payment.
Status changed: Draft to Pending.
Status changed: Draft to Pending.
Estimate viewed by 201.162.234.165 for the first time.
Estimate viewed by (admin) for the first time.
Estimate updated by admin.
Estimate updated by admin.
Estimate updated by admin.
Estimate updated by admin.
Estimate viewed by for the first time.