#1502
SECOND FLOOR MASTER BATHROOM
● Demolition all bath (not including walls and ceiling).
● Remove jacuzzi.
● Distribution of the new areas.
● Install new drywall and plaster for walls, only in the removed parts.
● Preparation Waterproofing , Schluter system for new shower.
● Installation Tile (Wall and floor only shower).
● Install the floor outside the shower.
● Installation (New Vanity, Faucets, Mirror, Bath Accessory).
● Carpenters Finish (Baseboard, Casing windows and new door for closet).
● Paint all the bathroom.
● Installing glass doors (Includes only installation of regular
doors; If you have special measurements and models is
requiring a separate estimate).
Note: only includes material for the shower, schluter system waterproofing, drywall / plaster, 2 by 4.
REMOVE WINDOWS
● Remove windows and place on side wall, includes Sidings patch.
Note: Dosn’t include material, only labor.
PLUMBING
● New water and drain lines, valve for shower, sink toilet.
● Install new toilet and sink.
Note: Includes all materials. Just the customer needs to buy one valve for the shower.
ELECTRIC
● Relocate electrical points, vanity, lights, fan.
Note: Includes Materials.
MOVING TRASH
PERMITS AND CITY FEES
The materials will be the responsibility of the client; it’s not included. Like these material: tile, grout, vanity light, sink toilet, mirror, doors and glass door.
This budget. Includes Material for the shower cabin and floor outside the shower. Schluter System. Ditra, 1 Niche, 2by4, Drywall-plaster, any other material not specified here. It will be paid by the client.
Any service requested that is not specified has an extra payment.
Thank you; we really appreciate your business.
Estimate viewed by (admin) for the first time.
Status changed: Draft to Pending.
Estimate viewed by 187.251.242.116 for the first time.
Status changed: Draft to Pending.
Estimate viewed by 73.61.155.35 for the first time.
Estimate updated by admin.
Estimate updated by admin.
Estimate updated by admin.
Estimate updated by admin.
Estimate updated by admin.
Estimate viewed by 72.70.61.101 for the first time.
Estimate viewed by 38.123.195.2 for the first time.
Estimate viewed by 172.56.112.167 for the first time.
Estimate viewed by 172.56.112.241 for the first time.
Estimate viewed by Alex Marquez (Alex) for the first time.
Estimate viewed by for the first time.