From
Alex Construction and Renovation INC. Alex Construction and Renovation INC.
45 Dan Road, suite 125
Canton, MA 02021
US
To
BATHROOM DEMOS
45 Dan Rd
Suit 125
Canton, MA 02072
US
Date
November 26, 2023
Estimate Number
1462-1740
Expiration Date
December 26, 2023
Estimate Total
$34,300.00
  1. Service
    Price
    Amount

    HALF BATHROOM RENOVATION

    ● Remove Floor, Toilet, Vanity.
    ● Preparation Schluter System on the Floor.
    ● Installation new Vanity, Faucets, Mirror, Bathroom Accessories.
    ● Install new Baseboard for all Bathroom.
    ● Paint all bathroom.

    $4,200
    $4,200
  2. Task
    Rate
    Qty
    Amount

    PLUMBING.

    ● Install New valve for toilet and sink.
    ● Install New Flange for toilet.
    ● Install New toilet and sink

    Note: This bathroom includes making a new wall to continue the same level (1 ft.)

    $1,000
    1
    $1,000
  3. Service
    Price
    Amount

    BATHTOOM RENOVATION SECOND FLOOR

    ● Demolition wall and tub shower.
    ● Remove half wall for new shower
    ● Repair framing in the new shower wall.
    ● Install Schluter System, preparation and waterproofing.
    ● Installation Tile on the wall and floor inside shower.
    ● Install Tile on the floor outside shower.
    ● Install plaster in areas affected by demolition.
    ● Installation (vanity, faucets, mirror, accessory bath)
    ● Installation bath fan or change for a new one.
    ● Carpenter finish (new baseboard)
    ● Installation glass shower (only sliding door, If you have special measurements and models is
    requiring a separate estimate)
    ● Paint all Bath.

    $11,000
    $11,000
  4. Task
    Rate
    Qty
    Amount

    PLUMBING
    ● New valve for shower, sink toile.
    ● Install new toilet and sink.
    ELECTRIC
    ● Change vanity fan and light with new ones.

    $2,000
    1
    $2,000
  5. Service
    Price
    Amount

    MASTER BATHROOM RENOVATION

    ● Demolition all bath (not including ceiling and wall).
    ● Remove tub.
    ● Repair wall.
    ● Repair framing for shower and new framing behind the tub (Schluter Niche).
    ● Install new drywall and plaster, only in the removed parts.
    ● Preparation, Schluter system Waterproofing for new shower.
    ● Installation Tile or Porcelain (Wall and floor only shower).
    ● Install floor Tile or Porcelain (floor outside the shower).
    ● Installation (New Vanity, Faucets, Mirror, Bathroom Accessories).
    ● Carpenters Finish (Install New Baseboard).
    ● Paint the bathroom.
    ● Installing glass doors (Includes only installation of regular doors; If you have special measurements and models is requiring a separate estimate).

    $11,000
    $11,000
  6. Task
    Rate
    Qty
    Amount

    PLUMBING
    ● New valve for shower, sink toilet.
    ● Install new toilet and sink.
    ● Install new Tub.
    ELECTRIC (Change vanity fan and light with new ones).

    $2,000
    1
    $2,000
  7. Service
    Price
    Amount

    MOVING TRASH

    $800
    $800
  8. Task
    Rate
    Qty
    Amount

    CITY’S PERMITS AND FEES

    $2,300
    1
    $2,300
Subtotal $34,300.00
Total $34,300.00

Notes

The materials will be the responsibility of the client; does not included materials like: tile, grout, vanity light, sink toilet, mirror, doors and glass door.

This proposal includes materials to install Waterproofing Schluter System , Ditra, 1 Niche, 2by4, Drywall-plaster for the cabin and floor shower,  any other material not specified here it will be paid by the client.

Any service requested that is not specified has an extra payment.

 

Thank you; we really appreciate your business.

Terms

METHOD OF PAYMENTS.

Down    payment 40% $13,720.00 at the day the contract gets signed.

Second Payment 25% $8,575.00 upon completion 50% of works.

Third    Payment 25% $8,575.00 upon completion 75% of works.

Final     Payment 10% $3,430.00 upon completion of the all contract works.

 

 

MAKE ALL CHECKS PAYABLE TO:
ALEX CONSTRUCTION AND RENOVATION
45 Dan RD, Suite 125, CANTON MA 02021.

Project Start on : December 1th, 2.023

 

CONTRACT TERMS.

Payments must be made by check or cash. **payment must be made within 3 days of project completion, or late fees will be applied. If payment is not made within 30 days of project completion, Alex construction will refer to your account for debt collection. An interest rate of 1.5% a month, or 18% annually will be charged to all past due accounts. A $35,00 fee will apply to any return check. Customers shall be and are responsible for all costs of collection, including reasonable attorney’s fees, arising from any breach of agreement or failure to pay any amount due and owing. This specifically includes, but not limited to, any losses by Alex Construction related to equipment or overhead.

WARRANTY / LIMITATIONS OF LIABILITY

The workman warranty period is 2 years from project completion. Alex Construction warranty covers any defective workmanship performed by the company, as well as any additional warranties imposed by law manufacturer’s warranties for all goods/products used also apply customers exclusive remedy and Alex Construction sole liability under this warranty shall be for Alex Construction to correct any material failure of performance, if such failure is reported to Alex Construction within the warranty period. customers claim for damages shall be limited to the amounts paid for services rendered hereunder only, and shall not include any incidental or consequential damages.

CHANGE ORDERS

Any changes to the scope of work as described above will only be binding and accepted if agreed upon in writing. Payment for a change order is subject to the same terms listed in paragraph 4 of this agreement, except that payment for change order items are not subject to the 50% down payment if the project has already commenced.
In the event of a change order, the parties agree the change order shall become part of this agreement, and subject to all the terms and conditions listed herein.

LEGAL NOTICES

If any portion of provision of this agreement is to any extent declared illegal or unenforceable by a court of competent jurisdiction, then the remainder of this agreement , will not be affected thereby, and each portion and provision of this agreement shall be valid and enforceable to the fullest extent permitted by the law.
This is a Massachusetts contract and shall be trusted and governed in all respects by the laws of the commonwealth of Massachusetts. I hereby accept this scope of work terms and conditions, including payment, and agree that there are no other terms which make up this agreement either expressed or implied.

 

 

________________________          ________________________          ________________________          ________________________

Home Owner/                                     Date                               Alex Construction                               Date

Builder Sing and Print                                                              and Renovation  INC.

Updated
November 26, 2023 @ 3:38 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 3:43 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 3:44 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 3:45 pm

Estimate updated by admin.

Viewed
November 26, 2023 @ 3:45 pm

Estimate viewed by (admin) for the first time.

Updated
November 26, 2023 @ 3:46 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 3:47 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 4:23 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 4:26 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 4:31 pm

Estimate updated by admin.

Viewed
November 26, 2023 @ 5:04 pm

Estimate viewed by 187.251.242.116 for the first time.

Viewed
November 26, 2023 @ 5:08 pm

Estimate viewed by 190.235.10.148 for the first time.

Viewed
November 26, 2023 @ 5:38 pm

Estimate viewed by 73.61.155.35 for the first time.

Updated
November 26, 2023 @ 8:35 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 8:37 pm

Estimate updated by admin.

Updated
November 26, 2023 @ 8:37 pm

Estimate updated by admin.

Viewed
November 27, 2023 @ 5:10 am

Estimate viewed by for the first time.

Status Update
February 15, 2024 @ 7:33 pm

Status changed: Pending to Declined.