From
Alex Construction and Renovation INC. Alex Construction and Renovation INC.
45 Dan Road, suite 125
Canton, MA 02021
US
To
Greg Gatlin
19 Mulberry Lane
Canton, MA 02021
US
Date
November 27, 2023
Estimate Number
1827
Expiration Date
December 27, 2023
Estimate Total
$46,000.00
  1. Service
    Price
    Amount

    BASEMENT REMODELING

    ● Remove floor al basement.
    ● Remove all ceiling of basement area.
    ● Install new vinyl floor all basement.(576 SQ/ft)
    ● Repair framing for new ceiling.
    ● Install drywall/plaster for new ceiling.
    ● Install new baseboard for basement.
    ● Paint all basement.

    $9,400
    $9,400
  2. ● New custom cabinet for Tv area / Fireplay. (10 ft by 08 ft)
    ● New bar area.(Framing/finish carpenters)

    Note: Includes Materials except the bar countertop.

    $11,500
    $11,500
  3. NEW BATHROOM BASEMENT

    ● New Framing.
    ● New insolation.
    ● New tile in shower cabin / floor outside.
    ● Drywall/plaster for bathroom area.
    ● Carpenters finish (Install 01 door, Baseboard, 01 vanity)
    ● Install accessory for bath.
    ● Paint all bath.

    $14,000
    $14,000
  4. PLUMBING

    ● New drain/water line.
    ● Install new valve for shower, new toilet, vanity sink.

    $3,500
    $3,500
  5. ELECTRIC

    ● New electrical system for the bath.
    ● Install new Fan/vanity light.

    $4,500
    $4,500
  6. MOVING TRASH

    $800
    $800
  7. Task
    Rate
    Qty
    Amount

    PERMITS AND CITY FEES

    $2,300
    1
    $2,300
Subtotal $46,000.00
Total $46,000.00

Notes

The materials will be the responsibility of the client; it’s not included materials like these: tile, grout, vanity light, sink toilet, mirror, doors and glass door.

This proposal includes material to install for the bathroom, Schluter System Waterproofing. Ditra, 1 Niche, 2by4, Drywall-plaster, any other material not specified here it will be paid by the client.

Any service requested that is not specified has an extra payment.

 

 

Thank you; we really appreciate your business.

Viewed
November 27, 2023 @ 5:19 pm

Estimate viewed by (admin) for the first time.

Status Update
November 27, 2023 @ 5:31 pm

Status changed: Draft to Pending.

Status Update
November 27, 2023 @ 5:31 pm

Status changed: Draft to Pending.

Viewed
November 28, 2023 @ 7:52 pm

Estimate viewed by Brithany Taylor (Brithany) for the first time.

Viewed
January 13, 2024 @ 3:40 am

Estimate viewed by for the first time.

Status Update
February 19, 2024 @ 4:20 pm

Status changed: Pending to Declined.