2036
BASEMENT REMODELING
Remove floor all basement.
Remove all ceiling basement Area.
Install New vinyl floor all basement.
Repair framing for new ceiling.
Install drywall/plaster for new ceiling.
Install new baseboard for basement.
Paint all basement.
NEW BATHROOM BASEMENT
New framing.
New insolation.
New Tile in shower cabin and floor outside the shower.
Install Schluter system, waterproofing.
Drywall / Plaster for bathroom area.
Carpenters finish (Install one door, one vanity, baseboard)
Install accessory for bath.
Paint all bath.
PLUMBING
New drain/water line.
Install valve for shower.
Install new toilet.
Install new vanity and sink.
ELECTRIC
New electrical system for the bathroom.
Install new fan / vanity light.
MOVING TRASH
The materials will be the responsibility of the client; it’s not included. Like these material: tile, grout, vanity light, sink toilet, mirror, doors and glass door.
This budget. Includes Material for the shower cabin and floor outside the shower. Schluter System. Ditra, 1 Niche, 2by4, Drywall-plaster, any other material not specified here. It will be paid by the client.
Any service requested that is not specified has an extra payment.
Thank you; we really appreciate your business.
Estimate updated by Brithany Taylor.
Estimate viewed by Brithany Taylor (Brithany) for the first time.
Estimate viewed by 190.237.60.238 for the first time.
Estimate viewed by 187.251.242.116 for the first time.
Estimate updated by Brithany Taylor.
Estimate updated by Brithany Taylor.
Estimate updated by Brithany Taylor.
Estimate viewed by 187.189.215.92 for the first time.
Estimate viewed by for the first time.
Status changed: Pending to Declined.