2285
RENOVATION SHOWER BATHROOM
● Demolition removed all floor, vanity, and toilet.
● Repair framing in the new shower wall.
● Install a Schluter system, preparation and waterproofing, a new shower,(only the wall) and floor outside the shower.
● Install one niche schluter system.
● Installation of tile in the wall and floor (only shower)
● Installation (New Vanity, Mirror,New Faucets and Vanity light)
● Install new baseboards in all baths.
● Installation glass shower. (only sliding door; if you have special
measurements and models, it requires a separate estimate.)
EXTERIOR FRAMING
●Remove windows.
●Repair/close the wall, install new insulation, and repair or patch the siding on
only part of the old windows.
Note: This includes the material; only the cost of the new siding is not included.
MOVING TRASH
PLUMBING
●New line water for the toilet and shower.
●New line drain for toilet and shower.
●Install a new tub, a new toilet, and a new vanity sink.
The materials will be the responsibility of the client; does not included materials like: tile, grout, vanity light, sink toilet, mirror, doors and glass door.
This proposal includes materials to install Waterproofing Schluter System , Ditra, 1 Niche, 2by4, Drywall-plaster for the cabin and floor shower, any other material not specified here it will be paid by the client.
Any service requested that is not specified has an extra payment.
Thank you; we really appreciate your business.
Estimate updated by Brithany Taylor.
Estimate updated by Brithany Taylor.
Estimate viewed by Brithany Taylor (Brithany) for the first time.
Estimate updated by Brithany Taylor.
Estimate updated by Brithany Taylor.
Estimate updated by Brithany Taylor.
Estimate updated by Brithany Taylor.
Estimate viewed by 172.56.112.32 for the first time.
Estimate viewed by 207.206.228.14 for the first time.
Estimate viewed by 172.56.113.230 for the first time.
Estimate viewed by 172.56.113.148 for the first time.
Estimate viewed by for the first time.
Status changed: Pending to Declined.