  1. Service
    Price
    Amount

    BATHROOM RENOVATION WITHOUT TUB

    ● Demolition wall and tub shower.
    ● Remove half wall for new shower
    ● Repair framing in the new shower wall.
    ● Install Schluter System, preparation and waterproofing.
    ● Installation Tile on the wall and floor inside shower.
    ● Install Tile on the floor outside shower.
    ● Install plaster in areas affected by demolition.
    ● Installation (vanity, faucets, mirror, accessory bath)
    ● Installation bath fan or change for a new one.
    ● Carpenter finish (new baseboard)
    ● Installation glass shower (only sliding door, If you have special measurements and models is
    requiring a separate estimate)
    ● Paint all Bath.

    $9,800
    $9,800
  2. Task
    Rate
    Qty
    Amount

    PLUMBING
    ● New drain for shower
    ● New valve for shower, sink, toilet.
    ● Install new toilet and sink.
    ● Install new Tub

    $1,700
    1
    $1,700
  3. Service
    Price
    Amount

    MASTER BATHROOM RENOVATION

    ● Demolition all bath (not including ceiling and wall).
    ● Remove tub (Jacuzzi)
    ● Repair wall.
    ● Repair framing for shower and new framing behind the tub (Schluter Niche).
    ● Install new drywall and plaster, only in the removed parts.
    ● Moving shower (New wall/Framing for Cabin shower)
    ● Preparation, Schluter system Waterproofing for new shower.
    ● Installation Tile or Porcelain (Wall and floor only shower).
    ● Install floor Tile or Porcelain (floor outside the shower).
    ● Installation (New Vanity, Faucets, Mirror, Bathroom Accessories).
    ● Carpenters Finish (Install New Baseboard).
    ● Paint the bathroom.
    ● Installing glass doors (Includes only installation of regular doors; If you have special measurements and models is requiring a separate estimate).

    $11,000
    $11,000
  4. Task
    Rate
    Qty
    Amount

    PLUMBING
    ●Moving water line
    ●Moving drain for shower
    ● New valve for shower, sink toilet.
    ● Install new toilet and sink.
    ● Install new Single Tub.

    $2,300
    1
    $2,300
  5. Service
    Price
    Amount

    MOVING TRASH

    $800
    $800
Subtotal $25,600.00
Total $25,600.00

Notes

The materials will be the responsibility of the client; does not included materials like: tile, grout, vanity light, sink toilet, mirror, doors and glass door.

This proposal includes materials to install Waterproofing Schluter System , Ditra, 1 Niche, 2by4, Drywall-plaster for the cabin and floor shower,  any other material not specified here it will be paid by the client.

Any service requested that is not specified has an extra payment.

 

Thank you; we really appreciate your business.

Updated
April 4, 2024 @ 12:31 am

Estimate updated by Alex Marquez.

Viewed
April 4, 2024 @ 12:32 am

Estimate viewed by Alex Marquez (Alex) for the first time.

Updated
April 4, 2024 @ 12:33 am

Estimate updated by Alex Marquez.

Updated
April 4, 2024 @ 12:35 am

Estimate updated by Alex Marquez.

Updated
April 4, 2024 @ 12:35 am

Estimate updated by Alex Marquez.

Viewed
April 6, 2024 @ 7:45 pm

Estimate viewed by 66.249.64.172 for the first time.

Viewed
April 7, 2024 @ 6:49 am

Estimate viewed by for the first time.

Updated
April 8, 2024 @ 1:59 pm

Estimate updated by Alex Marquez.

Viewed
April 8, 2024 @ 4:35 pm

Estimate viewed by 74.94.161.153 for the first time.