From
Alex Construction and Renovation INC. Alex Construction and Renovation INC.
45 Dan Road, suite 125
Canton, MA 02021
US
To
Erik
64 Pillon Rd
Milton, MA 02186
US
Date
October 21, 2024
Invoice Number
1462-1740-2220-2923-3530-3588
Invoice Due
November 4, 2024
Invoice Total
$45,550.00
Balance
$45,550.00
  1. Service
    Price
    Amount

    BATHROOM RENOVATION SECOND FLOOR WITH TUB

    ● Demolition wall and tub shower.
    ● Remove floor and half a wall of tile.
    ● Repair framing in the new shower wall.
    ● Install Schluter System, preparation and waterproofing.
    ● Installation Tile on the wall inside the shower.
    ● Install Tile on the floor outside the shower.
    ● Install blueboard & plaster in areas affected by demolition.
    ● Installation (vanity, faucets, mirror, accessory bath)
    ● Install a bath fan or changeit for a new one.
    ● Carpenter finish (Install new baseboard)
    ● Installation glass shower

    $9,000
    $9,000
  2. Task
    Rate
    Qty
    Amount

    PLUMBING BATH

    ● New valve for shower, sink, toilet.
    ● Install new toilet and sink Vanity.
    ● Install new Tub

    $2,500
    1
    $2,500
  3. Service
    Price
    Amount

    KITCHEN RENOVATION (LABOR)

    ● Demolition of the kitchen.
    ● Remove floor tile / Install new Hardwood floor kitchen area (Continuation with the dining room floor)
    ● Remplace kitchen window with a new one/ New casing. ( Includes window and casing)
    ● Open new ventilation for hood Range.
    ● Install new cabinets including island.
    ● Install handles for cabinets.
    ● Install backsplash
    ● Carpenters finish: baseboard, casing for 1 windows.
    ● Install appliances.
    ● Paint all the kitchen.

    $11,500
    $11,500
  4. REMOVE 2 WALL Kitchen/Dining Area (LABOR)

    ● Remove 2 existing wall / 2 Pantry corner.
    ● Open Concept: Install LVL- post- Drywall/plaster only in the part where the lvl will be installed.
    ● Install new floor hardwood only in the part where the wall will be removed.
    ● It does not include a plan in case the city requires it.

    $6,700
    $6,700
  5. Task
    Rate
    Qty
    Amount

    Materials for lvl Bim

    2 lvl 16ft
    2 Post 6 by 6
    2 Hanger for post
    20 hangers 2by8
    5 blueboard and plaster.

    $3,650
    1
    $3,650
  6. Service
    Price
    Amount

    MUD ROOM

    ● Remove carpet from mud room and install new tile.
    ● Include tinset.

    $1,700
    $1,700
  7. HARWOOD FLOOR FINISHIED ( Labor-Material)

    ● Sand/stain a hardwood floor first and second floor.

    $5,900
    $5,900
  8. MOVING TRASH

    $1,800
    $1,800
  9. Task
    Rate
    Qty
    Amount

    CITY’S PERMITS AND FEES

    $2,800
    1
    $2,800
Subtotal $45,550.00
Total $45,550.00

Notes

The materials will be the responsibility of the client; does not included materials like: tile, grout, vanity light, sink toilet, mirror, doors and glass door. For kitchen; cabinets, countertop, faucets, handle, appliances.

This proposal includes materials to install Waterproofing Schluter System, Tinset, Ditra, 1 Niche, 2by4, Blueboard-plaster for the cabin and floor shower,  any other material not specified here it will be paid by the client.

Any service requested that is not specified has an extra payment.

 

Thank you; we really appreciate your business.

Status Update
October 21, 2024 @ 12:00 pm

Status changed: Pending to Draft.

Status Update
October 21, 2024 @ 12:00 pm

Status changed: Draft to Pending.